Infrastructure
North Central Highway Rehabilitation
Rehabilitation and reconstruction of 62 kilometres of federal highway including full-depth pavement reconstruction, drainage renewal and eleven culvert crossings.
Location
Niger & Kogi States
Client
Federal Ministry of Works
Period
2023–2025
Contract Value
₦18.4bn
The Challenge
What made this project difficult
The corridor carried heavy commercial traffic that could not be closed, and long rainy seasons compressed the workable programme into narrow dry-season windows.
The Solution
How we delivered it
We phased construction into half-carriageway sections with managed traffic, pre-positioned aggregate from our own quarry 40km from site, and ran double shifts through every dry-season window.
Technology Used
- GNSS machine control grading
- Cold in-place recycling
- Nuclear density testing
- Fleet telematics scheduling
Impact
- Journey time reduced by 41%
- 62km restored to 20-year design life
- 410 direct jobs during construction