Construction

Kaduna River Crossing

A 340-metre, seven-span reinforced concrete bridge with approach embankments, river training works and scour protection.

Location

Kaduna State

Client

State Ministry of Infrastructure

Period

2022–2024

Contract Value

₦9.7bn

The Challenge

What made this project difficult

Deep alluvial deposits and seasonal flooding required foundations to be installed within a strictly limited low-water window.

The Solution

How we delivered it

Bored piles to 34 metres were installed from temporary causeways built ahead of the season, with precast deck elements fabricated off-site to compress on-river activity.

Technology Used

  • 34m bored pile foundations
  • Precast deck segments
  • Elastomeric bearing systems
  • Hydrological scour modelling

Impact

  • Two communities connected year-round
  • Detour of 55km eliminated
  • Zero lost-time injuries recorded

Gallery

From the site

Kaduna River Crossing — Site overview during construction
Kaduna River Crossing — Engineering team on site
Kaduna River Crossing — Plant and equipment mobilised to site
Kaduna River Crossing — Completed infrastructure asset

Let's Build Tomorrow Together

Ready to deliver excellence on your next project

Whether you're planning a major infrastructure project, seeking a trusted engineering partner, or exploring investment opportunities, RotDej Nigeria Limited is ready to deliver.