RotDej Nigeria Limited logoROTDEJNigeria Limited

Mining

Barite Processing Facility

Design and construction of an API-grade barite milling and bagging facility with laboratory, warehousing and despatch infrastructure.

Location

Benue State

Client

Upstream Services Consortium

Period

2022–2023

Contract Value

₦4.5bn

The Challenge

What made this project difficult

Output had to meet API 13A specification consistently to displace imported drilling-grade barite for the client's rig programme.

The Solution

How we delivered it

A closed-circuit milling line with in-line specific gravity monitoring was installed alongside an on-site laboratory certifying every batch before despatch.

Technology Used

  • Closed-circuit ball milling
  • In-line SG monitoring
  • Automated bagging line
  • On-site assay laboratory

Impact

  • API 13A compliance on 100% of batches
  • Import substitution for 3 rig programmes
  • Regional supply lead time halved

Gallery

From the site

Barite Processing Facility — Site overview during construction
Barite Processing Facility — Engineering team on site
Barite Processing Facility — Plant and equipment mobilised to site
Barite Processing Facility — Completed infrastructure asset